By the Tianhua Transformer engineering team · Xuzhou, China · November 2026
Add up the power of all chargers, apply a diversity factor or the limit set by your load management system, convert kW to kVA by dividing by the chargers' power factor, add other site loads and 20–25% for growth, then choose the next standard rating. For ten 150 kW DC chargers with load management at 70%, that is about 1,100 kVA, so a 1,250 kVA (IEC) or 1,500 kVA (IEEE) transformer.
Key points
- Start from charger nameplate power, then apply diversity or load management
- kVA = kW ÷ power factor; modern chargers are typically around 0.95–0.99
- Add the building, lighting and cooling loads that share the transformer
- Plan for growth: adding chargers later is cheaper if the transformer is already large enough
- Pad-mounted transformers suit North America; compact substations suit IEC markets
1. Know your chargers
| Charger type | Typical power per point | Where used |
|---|---|---|
| AC Level 2 | 7–22 kW | Workplaces, homes, hotels, car parks |
| DC fast | 50–150 kW | Retail, highway rest areas, fleet depots |
| DC high-power | Up to 350 kW and above | Highway hubs, truck and bus depots |
Use the maximum input power from the charger data sheet, which is slightly higher than the output power because of charger losses.
2. Sizing method, step by step
- Total charger power: number of chargers × maximum input power
- Diversity or load management: not every charger draws full power at once; use the cap set by your load management system, or a diversity factor agreed with the designer
- Convert to kVA: kVA = kW ÷ power factor
- Add other loads: building, lighting, cooling, canopy and future loads
- Add margin: 20–25% for growth, then choose the next standard rating
Worked example: 10 DC chargers × 150 kW = 1,500 kW. Load management limits the site to 70%: 1,050 kW. At power factor 0.95: about 1,105 kVA. Add 60 kVA of site load: about 1,165 kVA. Choose 1,250 kVA under IEC, or 1,500 kVA under IEEE ratings if more growth is expected.
3. Harmonics and power quality
Chargers are power electronic loads. Modern units with active front ends have low harmonic distortion, but older or cheaper chargers can inject more. Check the charger's total harmonic distortion. Where it is high, or many chargers share one transformer, specify a K-factor design or give the harmonic data so the transformer is sized to run cool.
4. Which transformer type?
| Type | Best for |
|---|---|
| Pad-mounted transformer | North American and other IEEE markets; compact, tamper-resistant, fed by underground cable |
| Compact (box) substation | IEC markets; MV switchgear, transformer and LV board in one enclosure |
| Dry-type transformer | Indoor car parks and buildings where oil is not allowed |
| Oil-immersed distribution transformer | Larger depots with an existing substation |
See the pad-mounted transformer guide and the compact substation guide.
How Tianhua can help
Tianhua supplies pad-mounted transformers (45–5,000 kVA), compact substations, dry-type and oil-immersed transformers for charging hubs and fleet depots, designed to IEC or IEEE.
- EV charging solutions
- Three-phase pad-mounted transformer
- ZGS American-type box substation
- YB European-type prefabricated substation
Jiangsu Tianhua Transformer Co., Ltd. is a transformer manufacturer founded in 2013 in Xuzhou, China, with a 107,000 m² plant, 500+ employees and exports to more than 30 countries and regions. About Tianhua · Factory and testing · Projects
Frequently asked questions
What size transformer do I need for 10 DC fast chargers?
For ten 150 kW chargers with load management at 70% and power factor 0.95, about 1,100 kVA of charging load, so a 1,250 kVA transformer (IEC) or 1,500 kVA (IEEE) with margin for site loads.
Do EV chargers need a special transformer?
Usually a standard distribution transformer is fine if it is sized correctly. Where harmonic distortion is high, a K-factor design is recommended.
What diversity factor should I use for EV charging?
It depends on how the site is used. Load management systems set a hard limit; without one, agree a factor with the designer based on expected usage.
Pad-mounted or compact substation for a charging hub?
Pad-mounted transformers are standard in North America; compact substations are common in IEC markets because they include MV switchgear and the LV board.
Can I add chargers later?
Yes, if the transformer was sized with growth margin. Replacing a transformer later costs far more than choosing the next size up today.
Planning an EV charging site?
Send your load list, single-line diagram or specification. Our engineers reply with a recommendation, datasheet and price within 24 hours.
More: EV charging solutions · All solutions · Transformer selection guide · FAQ