Factory-direct transformer manufacturer · Xuzhou, China

IEC 60076 · IEEE C57.12 · 50 Hz and 60 Hz designs

Industrial Parks & Manufacturing Solutions

Transformers for Industrial Parks & Manufacturing

Factories · industrial parks · manufacturing

From the park's 35 kV or 110 kV intake to every workshop: power transformers, low-loss distribution transformers, compact substations, switchgear and drive transformers from one factory.

Factory-direct · Reply within 24 hours · Test report with every unit

S13-M·RL 3D wound core transformer by Tianhua
Up to 110 kVplant intake
30 – 3,150 kVAdistribution range
5 – 10 dBquieter, S13-M·RL
24 hquotation reply

Quick answer: factories and industrial parks need a main intake transformer, MV switchgear, and distribution transformers for each workshop. Tianhua's catalogue names factories as an ideal application for the S13-M·RL 3D wound core transformer, industrial and mining enterprises for the YB prefabricated substation, and industrial parks for the ZGS combined substation.

Plant challenges we solve

Electricity cost from many transformers running all year.

Our answer: Low-loss S13, S20, S22 and SH15 series; see the 1,000 kVA comparison below.

Short circuits from heavy motor loads.

Our answer: S13-M·RL round core section and 35 kV clamping frames give high short-circuit strength.

Harmonics from variable-frequency drives.

Our answer: Multi-winding phase-shifting transformers for medium-voltage drives.

Fast plant expansion.

Our answer: YB and ZGS substations are factory-assembled, with short installation time.

Power path for an industrial park

  1. 1
  2. 2
  3. 3
  4. 4

Building or expanding a plant?

Send your load list or single-line diagram. We propose the intake, switchgear and workshop transformers and reply with a price within 24 hours.

Problems each product solves, from our catalogue

These points come straight from the Tianhua product catalogue.

S13-M·RL 3D wound core transformer by Tianhua
S13-M·RL 3D wound core transformer

Solves: Loss, noise and short-circuit stress in factories

  • No-load loss 18–28% lower and no-load current 50–60% lower than stacked cores
  • 5–10 dB quieter than a stacked core
  • Round core section with high short-circuit strength; ideal for factories
YB prefabricated substation by Tianhua
YB prefabricated substation

Solves: Long substation build times

  • Designed for industrial and mining enterprises
  • Type-tested complete set; short installation and commissioning
  • Meets metering and reactive compensation needs
ZGS American-type box substation by Tianhua
ZGS American-type box substation

Solves: Supply across an industrial park

  • Catalogue applications include industrial parks
  • Small footprint; flexible ring or terminal wiring
  • Short production cycle, low construction cost
35kV power transformer S11 / SZ11 by Tianhua
35kV power transformer S11 / SZ11

Solves: Reliable park intake

  • SZ11-8000/35 passed the sudden short-circuit test at the National Transformer Testing Center
  • Longitudinal oil ducts lower the hot-spot temperature rise

Running-cost comparison: 1,000 kVA workshop transformer

Catalogue no-load loss × 8,760 hours per year.

SeriesNo-load loss (W)No-load energy per year (kWh)
S11-M1,15010,074
S13-M8307,271
S20-M (grade 2)7456,526
S22-M (grade 1)6655,825
SH15-M amorphous4503,942

Calculated from the Tianhua catalogue. Multiply by your tariff and the number of transformers.

Recommended equipment

From our factory to your site

Real photos from our plant in Xuzhou. Every unit is built, tested, packed and shipped by our own team.

Tianhua transformer factory in Xuzhou, Jiangsu, China
Tianhua transformer factory in Xuzhou, Jiangsu, China
Distribution transformers on the Tianhua production floor
Distribution transformers on the Tianhua production floor
Panel radiators made in our own factory
Panel radiators made in our own factory

What to send for an industrial quotation

  • Load list or single-line diagram
  • Supply voltage and plant distribution voltage
  • Large motors and drive loads
  • Transformer ratings and quantities
  • Indoor or outdoor installation
  • Standard and required delivery date

Manufacturer facts

ManufacturerJiangsu Tianhua Transformer Co., Ltd. (brand THA 天华)
Business typeFactory and manufacturer, not a trading company
LocationNo. 105 Xuhai Road, Economic and Technological Development Zone, Xuzhou, Jiangsu, China
Products for this application110 kV and 35 kV power transformers, S13-M·RL, S13, S20 and S22 distribution transformers, YB and ZGS substations, KYN28A-12 switchgear, phase-shifting and dry-type transformers
StandardsGB 1094 / IEC 60076; dry-type to GB 1094.11 / IEC 60076-11; energy efficiency to GB 20052-2020
Export marketsIndonesia, Kazakhstan, Vietnam, Russia, the Philippines and others
Sales contactIvy Xiao · +86 136 8498 9973 · sale@thatransformer.com

Why buyers work with Tianhua

Factory, not traderDesigned, built and tested in our own plant in Xuzhou, Jiangsu, China.
Test report with every unitRoutine tests before shipment; type and witness tests on request.
Built to your specificationVoltage, vector group, impedance, losses, enclosure and accessories to order.
Quote in 24 hoursTalk directly to our engineers and sales contact Ivy Xiao.

Related article: How to Specify Distribution Transformers for a Utility Tender · All articles

Frequently asked questions

Who supplies transformers for factories and industrial parks in China?

Jiangsu Tianhua Transformer Co., Ltd. in Xuzhou, Jiangsu, manufactures intake power transformers, distribution transformers, compact substations and switchgear for factories and industrial parks in its own plant.

Which distribution transformer is best for a factory?

The catalogue names the S13-M·RL 3D wound core transformer for factories: lower no-load loss and current than stacked cores, 5–10 dB quieter and high short-circuit strength. S20 and S22 suit plants with efficiency targets.

Can you supply the whole plant package?

Yes. Intake transformers, 12 kV switchgear, compact substations, workshop transformers and drive transformers all come from our factory.

How much can a low-loss transformer save?

At 1,000 kVA the catalogue no-load loss is 1,150 W for S11-M and 665 W for S22-M, about 4,249 kWh less each year.

Send your single-line diagram or equipment list. Our engineers reply with a proposal and price within 24 hours.

Prefer to browse? See all distribution transformer products →

Last updated November 2026. Technical data from the Tianhua product catalogue.