Quick answerTianhua 35 kV power transformers step 35–38.5 kV down to 3.15–11 kV. The S11 series covers 630–31,500 kVA with off-circuit tap changer and the SZ11 series 2,000–20,000 kVA with on-load tap changer (±3×2.5%).
Key advantages
- HV and LV clamps use steel straps or beams for a rigid frame and strong short-circuit withstand
- SZ11-8000/35 sample passed the burst short-circuit test at the National Transformer Testing Center
- Longitudinal oil ducts in HV and LV coils lower hot-spot temperature
- Low loss and low noise to international levels
- Attractive, reliable design for factories, rural and urban networks
Type designation: S(F)(Z)11-□/□
- S: three-phase
- F: forced-air cooling (omitted for natural cooling)
- Z: on-load tap changer (omitted for off-circuit)
- 11: performance level code
- □: rated capacity (kVA) / voltage class (kV)
S11 35kV off-circuit tap changer, 630–31,500 kVA
LV for 8,000 kVA and above: 3.15 / 3.3 / 6.3 / 6.6 / 10.5 / 11 kV. Dyn11 available for 10.5 kV and 11 kV LV.
SZ11 35kV on-load tap changer, 2,000–20,000 kVA
Maximum current tapping at the −7.5% position.
Data from the Tianhua product catalogue. Capacity, voltage ratio, vector group, impedance, losses and dimensions can be designed to your specification.
Applications
- 35 kV utility and industrial substations
- Solar, wind and BESS collector substations
- Mines, steel, cement and chemical plants
Standards and testing
Designed and tested to GB 1094 and IEC 60076; loss levels to the series data above. Routine tests on every unit before shipment (ratio, vector group, winding resistance, no-load and load loss, impedance, applied and induced voltage) with the test report supplied. Type tests and third-party witness testing on request.
How to order
Send us
- rated power and quantity
- primary and secondary voltage, vector group and tapping range
- standard (IEC, IEEE / ANSI, GB or your utility specification) and frequency
- any loss limits or efficiency rule
- site conditions: altitude, ambient temperature, indoor or outdoor, corrosion
- destination port and preferred Incoterm
What happens next
- datasheet and price within 24 hours
- drawings for your approval
- production after drawing approval and advance payment, on the date confirmed in the quotation
- routine tests and test report; witness test on request
- export packing and shipping
Shipping policy · Terms and conditions
Who makes this transformer

Jiangsu Tianhua Transformer Co., Ltd. designs, builds and tests this transformer in its own 107,000 m² plant in Xuzhou, Jiangsu, China. Founded in 2013, Tianhua is a manufacturer, not a trading company: you deal directly with our engineers, and inspectors are welcome to witness the factory acceptance test.
- 500+ employees, including 7 senior engineers
- ISO 9001 quality system; IEC, IEEE / ANSI and GB designs
- Exported to more than 30 countries and regions
About Tianhua · Factory and testing · Certificates · Projects
Frequently asked questions
What is the load loss of a 10,000 kVA 35kV transformer?
S11-10000/35: no-load loss 8,700 W, load loss 45,300 W, impedance 7.5%. The on-load version SZ11-10000/35: 9,280 W and 48,100 W.
When should I choose an on-load tap changer?
Choose SZ11 when the secondary voltage must be regulated under load, for example on long feeders or renewable plants. Choose S11 for stable networks.
Was the design short-circuit tested?
Yes. An SZ11-8000/35 sample passed the burst short-circuit test at the National Transformer Testing Center in its first attempt.
How long does the 35 kV power transformer take to make?
Production starts after drawing approval and advance payment. The delivery date depends on rating and quantity and is confirmed in the quotation.
Can the 35 kV power transformer be built to my specification?
Yes. Rating, voltage ratio, vector group, impedance, losses, accessories and dimensions can be designed to your specification and standard.
How is the 35 kV power transformer shipped?
Smaller units can ship oil-filled. Large power transformers are usually shipped without oil and filled with dry gas, with radiators, bushings and conservator packed separately, by break-bulk sea freight.
What warranty does Tianhua give?
The warranty is 1 to 2 years depending on the product and size, confirmed in the quotation and sales contract.
Data from the Tianhua product catalogue. Written by the Tianhua Transformer engineering team, Xuzhou, China. Last updated November 2026.