110 kV Transformer Supply in South America
Locally sourced insulating oil was delivered directly to site. Tianhua estimates that the pilot reduced total transformer cost by about 6%.
Explore Tianhua’s company project records, field installation photos and engineering guidance for your next transformer project.
Explore the equipment supplied, Tianhua’s scope and the milestones reported in the company’s project summaries. The photos provide installation context.

South America · Supply reference
Locally sourced insulating oil was delivered directly to site. Tianhua estimates that the pilot reduced total transformer cost by about 6%.

Southeast Asia · Coating inspection reference
The project recorded a 200 µm coating that passed its first inspection. Tianhua arranged protective export packing for transport.
Browse transformer installations by topic and see what to check before specifying equipment, comparing bids or planning site work.

Paraguay · Site installation
Compare bids on the same delivery scope, from inland haulage and unloading to placement and site acceptance.

United States · Lifting and accessories
Line up the heavy-haul route, accessory checks and crane slot before finalizing the delivery schedule.

Romania · Foundation fit
Match the existing plinth survey to the supplier’s base drawing before releasing the transformer for fabrication.

Czech Republic · Bay access
Check what will fit between the existing walls and which components must be installed inside the bay.

Germany · Multi-unit delivery
Plan two delivery slots so the first crane setup or laydown area leaves access for the second transformer.

UAE · Site assembly
Confirm radiator assembly and oil acceptance before first energization, and schedule vendor support for handover.

Vietnam · Phased installation
Identify which unit must energize first, then align each shipment with foundation and feeder readiness.

Africa · Cable termination access
Agree who supplies connectors, cable supports and seals before awarding separate transformer and cable packages.

Netherlands · Buswork interface
Check bushing positions and phase arrangement against existing buswork before committing to the cutover outage.

Spain · Cable connection
On solar or storage projects, align the transformer cable box with the termination geometry and trench elevation.

Qatar · Cable cabinets
Check cable bend radius, door swing and installer access on one cabinet drawing before ordering.

Kazakhstan · Cable and civil interface
Set the trench exit and cable entry before scheduling the cable crew, especially for a winter work window.

Saudi Arabia · Outdoor installation
Compare guaranteed MVA at the site design temperature and confirm access to service fans and radiators.

Italy · Cooling and service access
Verify that fans and radiator sections can be removed beneath the existing gantry during a maintenance window.

Bangladesh · Cooling and oil system
Coordinate oil containment and drainage with the civil team and confirm radiator access at the planned plinth elevation.

Uzbekistan · Controls and automation
Agree which cooling, tap position, alarm and trip signals will be checked at the factory and verified on site.

Poland · Switchyard layout
Compare noise guarantees at the same cooling state and check that planned barriers leave room for servicing.

Pakistan · Factory and site test records
Tie factory and site test records to the same serial number and agree who signs off before shipment and handover.

Thailand · Outdoor insulation
Use site pollution conditions to select bushings, and specify rain and condensation protection for the control cabinet.

Malaysia · Two-unit operating duty
State which loads must stay powered with one unit out, then confirm standby or parallel duty in the RFQ.
Compare equipment choices and RFQ requirements for your application.
Substation transformers, utility requirements and site interfaces.
Transformer duty, redundancy and distribution for critical loads.
Transformer selection for renewable plants and storage projects.
Share the equipment list or single-line diagram, kVA or MVA rating, voltages, applicable standard, site conditions and required delivery date so our team can review your specification.