Transformer Radiator and Conservator Assembly

Back to project overview

Installation Gallery · Cooling and oil system

Transformer Radiator and Conservator Assembly
The side view shows radiator banks, an overhead oil conservator and connecting pipework.

Bangladesh transformer delivery during the monsoon

If a Bangladesh delivery falls in the monsoon, ask the heavy-haul contractor to check the last-mile route and unloading area in wet-weather conditions. Agree on who approves the route and unloading area, where the transformer can wait if the site is inaccessible, and who authorizes remobilization.

Show the owner’s flood design level, plinth level, cable entry elevations, oil containment and drainage on the same civil drawing. Confirm who signs off on the unloading area and drainage before dispatch, and leave access for later radiator servicing.

Planning a similar transformer installation?

Send the delivery window and any wet-weather access constraints. If the owner has specified a flood design level, include that and the plinth and cable entry elevations.