By the Tianhua Transformer engineering team · Xuzhou, China · November 2026
Special industrial transformers are designed around their load. Furnace transformers deliver very high current at low voltage and change taps often. Rectifier transformers feed DC processes and use phase-shifted windings (6, 12 or 24 pulse) to cancel harmonics. Mining transformers must be compact and robust, and railway traction transformers supply single-phase overhead lines with frequent load swings.
Key points
- Describe the process, not just the kVA: load cycle, current, harmonics and duty
- Furnace transformers need high-current LV leads, frequent tap changes and strong cooling
- Rectifier transformers use phase shifting so harmonics cancel on the supply side
- Mining units must be compact, rugged and suited to the site environment
- Traction transformers face large, fast load swings from trains
1. Arc and submerged arc furnace transformers
Furnace transformers step the supply down to a low secondary voltage with very high current to feed the electrodes. The load swings violently during melting, so the design needs strong mechanical bracing, an on-load tap changer for frequent voltage changes, low-resistance high-current LV leads and powerful cooling, often forced oil with water coolers.
Specify: furnace type and rating, secondary voltage range and steps, maximum secondary current, number of tap operations expected, and cooling water conditions.
2. Rectifier transformers
Rectifier transformers feed DC loads such as electrolysis (aluminium, chlor-alkali, green hydrogen), electroplating and DC drives. Rectifiers draw harmonic current. By combining windings with different phase shifts, a 12-pulse or 24-pulse system cancels the main harmonics before they reach the grid.
| Pulse number | How it is built | Effect |
|---|---|---|
| 6-pulse | One secondary winding | Simple; highest harmonics |
| 12-pulse | Two secondaries 30° apart (for example star and delta) | Cancels the 5th and 7th harmonics |
| 24-pulse | Phase-shifted windings or units 15° apart | Cancels more harmonics; cleanest supply current |
3. Mining transformers
Mining sites need transformers that are compact, rugged and easy to move as the mine develops. Oil-immersed units suit surface substations; dry-type units suit enclosed spaces. Give the site's altitude, temperature range, dust and humidity, and any mining safety standard that applies, so the enclosure and design match.
4. Railway traction transformers
Electric railways using 25 kV AC (27.5 kV in China) take power from the high-voltage grid through traction transformers in trackside substations. The load is single-phase and changes quickly as trains accelerate and brake, so the design must handle unbalance, frequent overloads and short-circuits. Metro systems typically use rectifier transformers to supply DC traction.
5. What to send us
- process description and load cycle
- supply voltage, secondary voltage and current, regulation range
- harmonic requirements or pulse number
- cooling medium and site conditions
- standards and any customer specification
How Tianhua can help
Tianhua designs arc and submerged arc furnace transformers, 6/12/24-pulse rectifier transformers, phase-shifting rectifier transformers for drives, mining transformers and railway traction transformers, to order.
- Mining, metals and railway solutions
- Electric arc furnace transformer
- Rectifier transformer 6/12/24-pulse
- Mining transformer
- Railway traction transformer
- Green hydrogen solutions
Jiangsu Tianhua Transformer Co., Ltd. is a transformer manufacturer founded in 2013 in Xuzhou, China, with a 107,000 m² plant, 500+ employees and exports to more than 30 countries and regions. About Tianhua · Factory and testing · Projects
Frequently asked questions
What is the difference between a furnace transformer and a power transformer?
A furnace transformer delivers very high current at low voltage to the furnace electrodes and must handle violent load swings and frequent tap changes.
Why use a 12-pulse rectifier transformer?
Two secondary windings 30° apart make the 5th and 7th harmonics cancel, so the supply current is much cleaner than with 6-pulse.
Which transformer is used for green hydrogen electrolysers?
A rectifier transformer, usually multi-pulse, feeding the rectifier that supplies DC to the electrolyser stacks.
What voltage do railway traction transformers supply?
Mainline AC railways commonly use 25 kV single-phase; in China the traction supply is 27.5 kV.
Can you design a special transformer to our process?
Yes. Send the process data and load cycle; our engineers design the transformer to suit and confirm it with drawings before production.
Need a special industrial transformer?
Send your load list, single-line diagram or specification. Our engineers reply with a recommendation, datasheet and price within 24 hours.
More: Mining, metals and railway solutions · All solutions · Transformer selection guide · FAQ