Factory-direct transformer manufacturer · Xuzhou, China

IEC 60076 · IEEE C57.12 · 50 Hz and 60 Hz designs

CKD Transformer Kits for Local Assembly

CKD Transformer Kits for Local Assembly

COMPLETELY KNOCKED DOWN SUPPLY

Source individual transformer parts for local assembly. We review your bill of materials (BOM) to confirm part references, quantities, packing groups, and the work your facility will complete.

Discuss a CKD Project Get the BOM template
Separate transformer panel radiators staged on wooden pallets
Panel radiators staged on pallets

Agree the parts and packing scope

Bill of materials

Identify supplied and locally sourced items, drawing revisions, and quantities for each line.

Compatibility and interfaces

Share the required dimensions and connection details so part references can be reviewed against the drawings.

Separate packing groups

Define which parts should be packed together, the required package identification, and any special packing instructions.

Local assembly and testing

Confirm your local assembly scope, available test facilities, and responsibility for final testing.

How we confirm your order

  1. Submit your BOM and drawings
    Mark the items to be supplied and indicate quantities, revisions, and project ratings.
  2. Review every supply line
    Confirm which parts are included, which are locally sourced, and how components will be grouped.
  3. Confirm the packing and handover
    Agree the packing list, part identification, and local assembly and test responsibilities.
Brown porcelain bushings packed in a partitioned wooden crate
Bushings packed in a partitioned crate

CKD BOM enquiry template

List each part number, drawing revision, quantity, who supplies it, and its packing group. Attach the completed sheet and referenced drawings when you send your enquiry.

Download BOM template (XLSX)

What to include in a CKD enquiry

  • BOM with part numbers, revisions, and quantities
  • Drawings and applicable transformer specification
  • Packing, labeling, and shipment grouping requirements
  • Local assembly scope, test requirements, and delivery destination
Discuss a CKD Project

Frequently asked questions

Can I enquire before the BOM is final?

You can share the current BOM and drawing revision for a preliminary discussion. Confirm the complete supply scope before ordering.

Do the photos show a complete CKD kit?

The photos show examples of component staging and packing. Actual kit contents are agreed against your project BOM.