Every Tianhua transformer is built and tested in our own 107,000 m² plant in Xuzhou, China. We control each process in-house, from silicon steel core to final test — which is why we can quote fast, customise freely and guarantee quality.





Every transformer undergoes the routine tests required by the applicable standard and the agreed technical specification. We confirm the test scope, acceptance criteria and reporting requirements for your model before testing.
These tests verify specified design performance. Examples include temperature-rise testing and, where the applicable standard classifies them as type or design tests, lightning impulse testing and sound level measurement.
When specified for the project, the test plan can include zero-sequence impedance measurement and frequency response analysis (FRA). The applicable standard and model also determine requirements for partial discharge, insulation resistance, capacitance, dielectric loss factor (tan δ) and no-load measurements at specified off-nominal voltages.
Model-specific third-party test record. The SSZ11-40000/110 power transformer passed short-circuit withstand and type testing at China’s National Transformer Quality Supervision and Inspection Center.
Preparing an RFQ? Include the required standard and edition, tests and acceptance criteria, reports, and any factory acceptance test (FAT) witness requirements. View Certificates & Standards.
You or your third-party inspector are welcome to witness the factory acceptance test. We also offer live video tours of the production lines.
Tell us your preferred date and the products you want to see.