Every Tianhua transformer is built and tested in our own 107,000 m² plant in Xuzhou, China. We control each process in-house, from silicon steel core to final test — which is why we can quote fast, customise freely and guarantee quality.

Transformers in front of the box-type transformer test control center
Box-Type Transformer Test Area and Control Center

Manufacturing processes in our factory

Steel strip processing equipment
Steel strip processing equipment
Horizontal transformer coil winding
Horizontal transformer coil winding
Vacuum epoxy resin casting for dry-type transformer coils
Vacuum epoxy resin casting for dry-type transformer coils
Worker routing insulated leads around the transformer core and coil assembly
Transformer active-part assembly and lead routing
  • Core workshop — intelligent servo slitting and cross-cutting lines for grain-oriented silicon steel, step-lap core stacking
  • Winding — horizontal and vertical coil winding machines for continuous and disc coils, LV foil winding machines
  • Dry-type production — vacuum static resin casting tanks, curing and drying ovens, dry-type assembly line
  • Tanks and enclosures — fiber laser cutting, CNC turret punching, CNC bending and hemming machines with robotic handling
  • Radiators — our own panel radiator workshop, built to JB/T 5347

Tests before shipment

Every transformer undergoes the routine tests required by the applicable standard and the agreed technical specification. We confirm the test scope, acceptance criteria and reporting requirements for your model before testing.

Routine tests on each unit

  • Winding resistance, voltage ratio and polarity or vector group, as applicable
  • No-load loss and excitation current, short-circuit impedance and load loss
  • Applicable routine dielectric tests, including applied-voltage or induced-voltage withstand tests as specified
  • On-load tap changer (OLTC) checks, where fitted and required

Type or design tests

These tests verify specified design performance. Examples include temperature-rise testing and, where the applicable standard classifies them as type or design tests, lightning impulse testing and sound level measurement.

Special tests and project-specific measurements

When specified for the project, the test plan can include zero-sequence impedance measurement and frequency response analysis (FRA). The applicable standard and model also determine requirements for partial discharge, insulation resistance, capacitance, dielectric loss factor (tan δ) and no-load measurements at specified off-nominal voltages.

Model-specific third-party test record. The SSZ11-40000/110 power transformer passed short-circuit withstand and type testing at China’s National Transformer Quality Supervision and Inspection Center.

Preparing an RFQ? Include the required standard and edition, tests and acceptance criteria, reports, and any factory acceptance test (FAT) witness requirements. View Certificates & Standards.

Testing facilities and equipment

Distribution transformers on roller conveyors at the intelligent test station
Distribution transformer test station
Blue measurement consoles outside the shielded partial discharge laboratory
Shielded partial discharge laboratory
Distribution transformer with electrical test leads connected inside a marked test area
Distribution transformer electrical test setup
High-voltage test equipment next to a power transformer inside a test bay
High-voltage transformer test bay

Witness testing and factory visits

You or your third-party inspector are welcome to witness the factory acceptance test. We also offer live video tours of the production lines.