Buying guide · Tianhua Transformer engineering team
Specify the voltage ratio, MVA rating, vector group, impedance, tap changer (OLTC or off-circuit), cooling, standard and site conditions. Tianhua builds oil-immersed power transformers from 35 kV to 220 kV and 0.8 MVA to 360 MVA, designed to IEC 60076, IEEE C57.12 or GB 1094.
Power transformers connect transmission and sub-transmission networks to distribution, power plants and large industrial loads. They are designed to order, so a clear specification saves weeks.

| Voltage classes | 35 kV, 110 kV and 220 kV; 66 kV and 132 kV designed to order |
|---|---|
| Ratings | 0.8 MVA to 360 MVA |
| Types | Two-winding, three-winding, autotransformers, split-winding |
| Tap changers | On-load (OLTC) or off-circuit |
| Cooling | ONAN, ONAF, OFAF, ODAF |
| Standards | IEC 60076, IEEE / ANSI C57.12, GB 1094; 50 or 60 Hz |
| Proven design | SSZ11-40000/110 passed short-circuit and full type tests |
| Voltage class | Standard range | Typical use |
|---|---|---|
| 35 kV | 800 kVA to 31.5 MVA | Industrial plants, mines, solar and wind collection, rural substations |
| 110 kV / 132 kV | 6.3 MVA to 63 MVA | Grid substations, large industry, data center campuses |
| 220 kV | 31.5 MVA to 360 MVA | Transmission substations, power plants, large renewable plants |
Ratings outside these ranges are designed to order.
| Parameter | Typical values | Why it matters |
|---|---|---|
| Voltage ratio | 220/35 kV, 110/11 kV, 132/33 kV | Fixes the insulation design |
| Rated power | ONAN / ONAF ratings, e.g. 40/50 MVA | Sets core and winding size and cooling |
| Vector group | YNd11, YNyn0d11 | Must match parallel units and the network |
| Impedance | Typically 8–14% depending on rating | Limits fault current; affects voltage regulation |
| Tap changer | OLTC ±8 × 1.25% or off-circuit ±2 × 2.5% | Keeps output voltage steady |
| Losses | Guaranteed no-load and load loss | Decides lifetime energy cost |
| Insulation levels | BIL / LI and AC test voltages | Matches network and lightning exposure |
| Sound level | dB(A) limit at 0.3 m or 2 m | Important near homes |
Choose an on-load tap changer (OLTC) when the grid voltage varies under load or when the transformer feeds a regulated network. It changes taps while energised and can be automated with a voltage regulating relay.
Choose an off-circuit tap changer when the voltage is stable and the ratio only needs setting at commissioning. It is simpler and costs less.
ONAN suits most units up to medium ratings. ONAF adds fans to the radiators for a higher rating at peak load. OFAF and ODAF pump the oil through coolers for large ratings and compact layouts.
Give the maximum ambient temperature, altitude, seismic zone and pollution level. Hot climates, high altitude and coastal sites change the cooling design, creepage distance and paint system.
Every power transformer receives routine tests to IEC 60076 or IEEE C57.12 before shipment:
Lightning impulse, partial discharge, temperature rise, sound level and SFRA tests are carried out as type or special tests when specified. You or a third-party inspector are welcome to witness the factory acceptance test.
High-voltage designs are calculated with Toshiba analysis software and our own procedures for the core, windings, active part, leads and tank. Cores use grain-oriented silicon steel cut on our own servo slitting and cross-cutting lines. Active parts are vacuum dried, and short-circuit strength is proven by test: our SSZ11-40000/110 design passed short-circuit withstand and full type tests at China's National Transformer Quality Supervision and Inspection Center.
Large power transformers are usually shipped without oil and filled with dry gas. Radiators, bushings and the conservator are removed and packed separately, then fitted and oil-filled on site. Transport is break-bulk sea freight, with road or rail to the port.
In some markets the oil can be bought locally to save freight and duty; on a 110 kV project in South America this cut the total cost by about 6%. See our shipping policy and projects.

This guide is written by the engineering team of Jiangsu Tianhua Transformer Co., Ltd., a transformer manufacturer founded in 2013 in Xuzhou, Jiangsu, China. Every unit is designed, built and tested in our own 107,000 m² plant: core cutting, winding, drying, resin casting, tanks, radiators, assembly and testing. You deal directly with the factory engineers.
About Tianhua · Factory and testing · Certificates · Projects
Standard designs cover 800 kVA to 31.5 MVA at 35 kV, 6.3 to 63 MVA at 110 kV and 31.5 to 360 MVA at 220 kV. Other ratings are designed to order.
Yes, send your specification. Our engineers confirm the design and test plan with the quotation.
Routine tests to IEC 60076 or IEEE C57.12 on every unit, plus lightning impulse, partial discharge, temperature rise, sound level and SFRA when specified. Witness testing is welcome.
Power transformers are scheduled per project after drawing approval and advance payment. The delivery date is confirmed in the quotation.
Usually without oil and filled with dry gas, with radiators, bushings and conservator packed separately, by break-bulk sea freight.
The tap changer type and make are agreed in the quotation to suit your specification and utility requirements.
Send capacity, voltages, standard, quantity and destination. Our engineers reply with a datasheet and price within 24 hours.
Written by the Tianhua Transformer engineering team, Xuzhou, China. Last updated November 2026.