Can the largest transformer shipping piece reach the Czech bay?
For a Czech substation replacement, review the assembled footprint and the largest transport piece as two separate checks. Give bidders a surveyed route from the site gate to the foundation, showing the narrowest opening, turns and fixed walls. Require the proposed shipping dimensions and handling envelope on the same drawing.
Ask which accessories ship loose and where they will be fitted in the bay. Confirm how the placement and assembly sequence fits the available outage window and any restrictions from adjacent bays before agreeing on the installation scope.