Installation Gallery · Foundation fit
Can the replacement fit an existing plinth in Romania?
On a Romanian utility upgrade, settle the civil interface before releasing the transformer outline. If an existing plinth is to be reused, compare the survey with the supplier’s base rails, support points, jacking positions, oil containment and cable trench exits. Agree on who approves any deviation before fabrication.
Ask bidders to price the surveyed fit and identify any civil work they have assumed. Attach the existing and proposed foundation drawings and the required changeover window to the RFQ. These are the documents that show whether the unit can be set in place within the planned outage.
Planning a similar transformer installation?
Send the required rating, voltage ratio and changeover date. If you plan to reuse the plinth, email the as-built survey so we can review the base interface.