C4-M Substation Equipment Supply in Southeast Asia

Back to project overview

Project case study

C4-M Coating and Export Packing for Substation Equipment

A substation project in Southeast Asia required C4-M surface protection for its electrical equipment. Tianhua’s project summary records a 200 µm coating and a pass at the first coating inspection. Tianhua arranged protective export packing to protect the coated surfaces during transport.

Site crew working on a power transformer at an outdoor substation
Transformer installation at an outdoor substation

Supply scope and inspection result

Equipment
Electrical equipment for a substation
Tianhua’s scope
Equipment supply with C4-M surface protection and protective export packing
Inspection result
Coating passed the first inspection, as reported by Tianhua

What EPC Buyers Should Confirm

How will the coating be accepted before shipment?

Specify the site exposure, surface preparation, coating system and required dry film thickness. Agree on the measurement method, acceptance criteria and inspection records the supplier will provide before shipment.

How will packing protect the coating in transit?

Ask the supplier to show how coated surfaces at supports, restraints and other contact points will be protected during handling and transport. Confirm what packing and handling documentation the supplier will provide.

Who accepts the coating at delivery?

Agree who inspects and accepts the coating on arrival. Use the pre-shipment inspection record to document any transport damage. Before award, name who approves the touch-up method, who carries out the repair and who signs off after reinspection.

Request pricing for C4-M substation equipment

Share your equipment list, delivery location and target date. Include the C4-M coating specification and any inspection or export packing requirements you want priced.