Jiangsu Tianhua Transformer Co., Ltd. ships transformers, compact substations and switchgear worldwide from our factory in Xuzhou, Jiangsu, China. This page explains how orders are packed, shipped and documented. The exact terms for your order are set out in the quotation and sales contract, and those terms take priority over this page.
At a glance
| Ships from | Our factory in Xuzhou, Jiangsu, with road and rail links to the main Chinese seaports |
|---|---|
| Delivery terms | Incoterms 2020: EXW, FOB, CFR or CIF, agreed in each quotation |
| Production time | Typically 4–6 weeks for standard distribution transformers; power transformers per project |
| Before shipment | Routine tests on every unit, test report sent before shipment, witnessed FAT on request |
| Damage in transit | Report within 24 hours of arrival, with photos |
| Warranty | 1 to 2 years depending on product and size, confirmed in the quotation |
1. Delivery terms
Delivery terms are agreed in each quotation using Incoterms 2020, for example EXW Xuzhou factory, FOB a Chinese port, or CFR / CIF to your destination port. Tell us your destination port or site address and preferred term, and we quote on that basis. The point where risk passes to the buyer follows the Incoterm in the contract.
2. Production and lead time
Production starts after drawing approval and receipt of the advance payment. Standard distribution transformers typically take 4–6 weeks. Power transformers and special designs are scheduled per project, and the date is confirmed in the quotation. Transit time is added on top and depends on the destination and shipping method.
3. Inspection before shipment
Every transformer passes routine tests before it is packed, and the test report is sent to you before shipment. You or your third-party inspector are welcome to witness the factory acceptance test (FAT) in Xuzhou or follow it by live video. Please tell us when you order if a witnessed FAT is required, so it can be planned into the schedule.
4. How equipment is shipped
| Equipment | Usual transport | Condition on arrival |
|---|---|---|
| Oil-immersed distribution transformers | 20 ft or 40 ft container; flat-rack or open-top for larger units | Filled with oil and ready to install. Sealed units do not need core lifting after normal transport. |
| Dry-type transformers | Container, in a closed wooden case | Protected from moisture and dust; enclosure fitted or packed separately |
| Compact and prefabricated substations | Flat-rack, open-top or break-bulk depending on size | Factory-assembled and tested; only site connections remain |
| Power transformers 35–220 kV | Break-bulk sea freight, with road or rail to the port | Usually shipped without oil and filled with dry gas. Radiators, bushings and conservator are packed separately, then fitted and oil-filled on site. |
| Switchgear and panel radiators | Container, on pallets or in wooden cases | Ready to install |
Xuzhou sits where the Beijing–Shanghai and Longhai railways meet, with direct road and rail links to the main Chinese seaports.
5. Export packing
- Packing is chosen for each unit's type, size and route: wooden cases (treated to ISPM 15 where required), steel frames or skids, with bracing inside the container.
- Bushings, gauges and other fragile parts are protected or removed and packed separately, and each case is marked and listed on the packing list.
- Painted surfaces are protected in transit. For a Southeast Asia project with a C4-M corrosion class, a 200 µm coating and a dedicated packing plan meant the equipment passed the corrosion inspection the first time.
- Case markings, dimensions and gross weights are confirmed with your quotation, so you can plan unloading and lifting at site.
6. Shipping documents
Each shipment comes with:
- commercial invoice and packing list
- bill of lading or other transport document
- routine test report for every unit
- outline (GA) drawing
A certificate of origin, insurance certificate, type test reports and other documents required by your customs or tender can be supplied on request. Please tell us before shipment.
7. Local transformer oil supply
In some markets the transformer oil can be bought locally and delivered straight to site, which saves the freight and import duty on the oil. On a 110 kV project in South America this cut the total transformer cost by about 6%. This option is currently available for projects in South America, Spain, France and Italy.
8. Insurance and damage in transit
Under CIF terms we arrange cargo insurance. Under other terms the buyer arranges insurance from the point where risk passes.
When the goods arrive, check the cases and the equipment before signing the delivery receipt. If you find damage:
- note it on the delivery receipt
- take photographs of the cases and the equipment
- report it to us within 24 hours of arrival by email to sale@thatransformer.com
We will then support your insurance claim and arrange replacement parts.
9. Warranty
The warranty is 1 to 2 years depending on the product and size. The exact period and conditions are confirmed in the quotation and sales contract. See our terms and conditions for what the warranty covers.