Factory-direct transformer manufacturer · Xuzhou, China

IEC 60076 · IEEE C57.12 · 50 Hz and 60 Hz designs

Shipping policy

Last updated: 20 November 2026

Jiangsu Tianhua Transformer Co., Ltd. ships transformers, compact substations and switchgear worldwide from our factory in Xuzhou, Jiangsu, China. This page explains how orders are packed, shipped and documented. The exact terms for your order are set out in the quotation and sales contract, and those terms take priority over this page.

At a glance

Ships fromOur factory in Xuzhou, Jiangsu, with road and rail links to the main Chinese seaports
Delivery termsIncoterms 2020: EXW, FOB, CFR or CIF, agreed in each quotation
Production timeTypically 4–6 weeks for standard distribution transformers; power transformers per project
Before shipmentRoutine tests on every unit, test report sent before shipment, witnessed FAT on request
Damage in transitReport within 24 hours of arrival, with photos
Warranty1 to 2 years depending on product and size, confirmed in the quotation

1. Delivery terms

Delivery terms are agreed in each quotation using Incoterms 2020, for example EXW Xuzhou factory, FOB a Chinese port, or CFR / CIF to your destination port. Tell us your destination port or site address and preferred term, and we quote on that basis. The point where risk passes to the buyer follows the Incoterm in the contract.

2. Production and lead time

Production starts after drawing approval and receipt of the advance payment. Standard distribution transformers typically take 4–6 weeks. Power transformers and special designs are scheduled per project, and the date is confirmed in the quotation. Transit time is added on top and depends on the destination and shipping method.

3. Inspection before shipment

Every transformer passes routine tests before it is packed, and the test report is sent to you before shipment. You or your third-party inspector are welcome to witness the factory acceptance test (FAT) in Xuzhou or follow it by live video. Please tell us when you order if a witnessed FAT is required, so it can be planned into the schedule.

4. How equipment is shipped

EquipmentUsual transportCondition on arrival
Oil-immersed distribution transformers20 ft or 40 ft container; flat-rack or open-top for larger unitsFilled with oil and ready to install. Sealed units do not need core lifting after normal transport.
Dry-type transformersContainer, in a closed wooden caseProtected from moisture and dust; enclosure fitted or packed separately
Compact and prefabricated substationsFlat-rack, open-top or break-bulk depending on sizeFactory-assembled and tested; only site connections remain
Power transformers 35–220 kVBreak-bulk sea freight, with road or rail to the portUsually shipped without oil and filled with dry gas. Radiators, bushings and conservator are packed separately, then fitted and oil-filled on site.
Switchgear and panel radiatorsContainer, on pallets or in wooden casesReady to install

Xuzhou sits where the Beijing–Shanghai and Longhai railways meet, with direct road and rail links to the main Chinese seaports.

5. Export packing

  • Packing is chosen for each unit's type, size and route: wooden cases (treated to ISPM 15 where required), steel frames or skids, with bracing inside the container.
  • Bushings, gauges and other fragile parts are protected or removed and packed separately, and each case is marked and listed on the packing list.
  • Painted surfaces are protected in transit. For a Southeast Asia project with a C4-M corrosion class, a 200 µm coating and a dedicated packing plan meant the equipment passed the corrosion inspection the first time.
  • Case markings, dimensions and gross weights are confirmed with your quotation, so you can plan unloading and lifting at site.

6. Shipping documents

Each shipment comes with:

  • commercial invoice and packing list
  • bill of lading or other transport document
  • routine test report for every unit
  • outline (GA) drawing

A certificate of origin, insurance certificate, type test reports and other documents required by your customs or tender can be supplied on request. Please tell us before shipment.

7. Local transformer oil supply

In some markets the transformer oil can be bought locally and delivered straight to site, which saves the freight and import duty on the oil. On a 110 kV project in South America this cut the total transformer cost by about 6%. This option is currently available for projects in South America, Spain, France and Italy.

8. Insurance and damage in transit

Under CIF terms we arrange cargo insurance. Under other terms the buyer arranges insurance from the point where risk passes.

When the goods arrive, check the cases and the equipment before signing the delivery receipt. If you find damage:

  1. note it on the delivery receipt
  2. take photographs of the cases and the equipment
  3. report it to us within 24 hours of arrival by email to sale@thatransformer.com

We will then support your insurance claim and arrange replacement parts.

9. Warranty

The warranty is 1 to 2 years depending on the product and size. The exact period and conditions are confirmed in the quotation and sales contract. See our terms and conditions for what the warranty covers.

Questions about this policy?

For shipping questions or a freight quotation, contact Ivy Xiao. More answers on lead time, packing and shipping are in our FAQ.