Factories · industrial parks · manufacturing
From the park's 35 kV or 110 kV intake to every workshop: power transformers, low-loss distribution transformers, compact substations, switchgear and drive transformers from one factory.
Factory-direct · Reply within 24 hours · Test report with every unit

Quick answer: factories and industrial parks need a main intake transformer, MV switchgear, and distribution transformers for each workshop. Tianhua's catalogue names factories as an ideal application for the S13-M·RL 3D wound core transformer, industrial and mining enterprises for the YB prefabricated substation, and industrial parks for the ZGS combined substation.
Electricity cost from many transformers running all year.
Our answer: Low-loss S13, S20, S22 and SH15 series; see the 1,000 kVA comparison below.
Short circuits from heavy motor loads.
Our answer: S13-M·RL round core section and 35 kV clamping frames give high short-circuit strength.
Harmonics from variable-frequency drives.
Our answer: Multi-winding phase-shifting transformers for medium-voltage drives.
Fast plant expansion.
Our answer: YB and ZGS substations are factory-assembled, with short installation time.

Park intake110 kV / 35 kV

MV distribution10–12 kV

Workshops and production lines10 kV to 0.4 kV

Drives and indoor areasVFD and dry-type
Building or expanding a plant?
Send your load list or single-line diagram. We propose the intake, switchgear and workshop transformers and reply with a price within 24 hours.
These points come straight from the Tianhua product catalogue.

Solves: Loss, noise and short-circuit stress in factories

Solves: Long substation build times

Solves: Supply across an industrial park

Solves: Reliable park intake
Catalogue no-load loss × 8,760 hours per year.
| Series | No-load loss (W) | No-load energy per year (kWh) |
|---|---|---|
| S11-M | 1,150 | 10,074 |
| S13-M | 830 | 7,271 |
| S20-M (grade 2) | 745 | 6,526 |
| S22-M (grade 1) | 665 | 5,825 |
| SH15-M amorphous | 450 | 3,942 |
Calculated from the Tianhua catalogue. Multiply by your tariff and the number of transformers.
S13-M·RL 3D wound core transformerFactories, low noiseView specifications →
S20 / S22 energy-efficiency transformerEfficiency grade 2 and 1View specifications →
YB prefabricated substationIndustrial and mining sitesView specifications →
ZGS American-type box substationIndustrial parksView specifications →
KYN28A-12 metal-clad switchgear12 kV switchgearView specifications →
Phase-shifting VFD transformerMV drive transformersView specifications →Real photos from our plant in Xuzhou. Every unit is built, tested, packed and shipped by our own team.



| Manufacturer | Jiangsu Tianhua Transformer Co., Ltd. (brand THA 天华) |
|---|---|
| Business type | Factory and manufacturer, not a trading company |
| Location | No. 105 Xuhai Road, Economic and Technological Development Zone, Xuzhou, Jiangsu, China |
| Products for this application | 110 kV and 35 kV power transformers, S13-M·RL, S13, S20 and S22 distribution transformers, YB and ZGS substations, KYN28A-12 switchgear, phase-shifting and dry-type transformers |
| Standards | GB 1094 / IEC 60076; dry-type to GB 1094.11 / IEC 60076-11; energy efficiency to GB 20052-2020 |
| Export markets | Indonesia, Kazakhstan, Vietnam, Russia, the Philippines and others |
| Sales contact | Ivy Xiao · +86 136 8498 9973 · sale@thatransformer.com |
Related article: How to Specify Distribution Transformers for a Utility Tender · All articles
Jiangsu Tianhua Transformer Co., Ltd. in Xuzhou, Jiangsu, manufactures intake power transformers, distribution transformers, compact substations and switchgear for factories and industrial parks in its own plant.
The catalogue names the S13-M·RL 3D wound core transformer for factories: lower no-load loss and current than stacked cores, 5–10 dB quieter and high short-circuit strength. S20 and S22 suit plants with efficiency targets.
Yes. Intake transformers, 12 kV switchgear, compact substations, workshop transformers and drive transformers all come from our factory.
At 1,000 kVA the catalogue no-load loss is 1,150 W for S11-M and 665 W for S22-M, about 4,249 kWh less each year.
Send your single-line diagram or equipment list. Our engineers reply with a proposal and price within 24 hours.
Prefer to browse? See all distribution transformer products →
Last updated November 2026. Technical data from the Tianhua product catalogue.