Solar · wind · battery storage
Step-up equipment for new-energy plants. We cover the inverter-side box transformer, the 35 kV collector line and the main step-up transformer at the plant substation, all factory-assembled and tested.
Quick answer: for PV, wind and BESS plants, Tianhua supplies inverter-booster integrated substations and integrated step-up box transformers. We also make three-chamber box substations, 20 ft prefabricated cabin substations and double-split dry-type transformers for two inverters. At the plant substation we supply 35 kV and 110 kV main transformers and split-winding transformers.
Large plants need many step-up points with little site work.
Our answer: Integrated units arrive assembled and tested: inverter-booster, step-up box and cabin substations need only foundations and cables.
Two inverters feeding one transformer.
Our answer: Double-split dry-type transformers have two LV windings, one per inverter, with top copper busbar outlets.
Desert heat, dust and rain at remote sites.
Our answer: HV/LV compartments up to IP54 and sealed tanks up to IP68. The three-chamber design keeps the transformer in a naturally ventilated chamber.
Operators need remote monitoring.
Our answer: Pressure and temperature gauges with a communication interface, status contacts and remote breaker control on the cabin substation.

Generation and invertersPV strings · wind turbines · batteries

Step-up at the array or turbineLV to 10 kV or 35 kV

Collector line and plant substation35 kV

Grid connection110 kV and above
Planning a solar, wind or BESS plant?
Send your block size, inverter model and collector voltage. We propose the step-up equipment and reply with a price within 24 hours.
These points come straight from the Tianhua product catalogue for our new-energy equipment.

Solves: Getting low-voltage PV or wind output onto the 10 / 35 kV line

Solves: Transformer overheating inside traditional box substations

Solves: Slow, costly site work for MV grid connection of ground-mounted plants

Solves: The conflict between power supply, land use and the environment
| Equipment | Best for | Output | Construction | Protection / monitoring |
|---|---|---|---|---|
| Inverter-booster integrated substation | Utility-scale PV | MV AC, e.g. 2 MW block | Inverter, transformer and HV section in one container | HV protection and metering |
| Integrated step-up box transformer | PV, wind, BESS | 10 kV or 35 kV | HV/LV switchgear and transformer in one oil tank | IP54 compartments, IP68 tank, gauges with comms |
| Three-chamber box-type substation | PV, wind | To project | HV, LV and transformer chambers | Mechanical interlocks, remote signals |
| Prefabricated cabin substation | BESS, ground PV | MV AC | 20 ft container: LV cabinet, transformer, RMU, auxiliary power | IP54, class 0.5 detection, remote breaker control |
| Double-split dry-type PV transformer | Two-inverter PV blocks | 10 kV | Dry-type, two LV windings | Top busbar outlets, low loss |
Inverter-booster integrated substationInverter + step-up transformer in one boxView specifications →
Integrated step-up box transformer10 / 35 kV, sealed tank, IP54 / IP68View specifications →
Three-chamber box-type substationHV, LV and transformer chambersView specifications →
Prefabricated cabin substation20 ft container with RMU and LV cabinetView specifications →
Double-split dry-type PV transformerTwo LV windings for two invertersView specifications →
35kV power transformer S11 / SZ11630–31,500 kVA plant step-upView specifications →
Split-winding transformerLimits short-circuit currentView specifications →
110kV power transformer6.3–63 MVA grid connection, OLTCView specifications →
ZGS American-type box substationCompact distribution, 6–10 kVView specifications →Real photos from our plant in Xuzhou. Every unit is built, tested, packed and shipped by our own team.



| Manufacturer | Jiangsu Tianhua Transformer Co., Ltd. (brand THA 天华) |
|---|---|
| Business type | Factory and manufacturer, not a trading company |
| Location | No. 105 Xuhai Road, Economic and Technological Development Zone, Xuzhou, Jiangsu, China |
| Products for this application | Integrated step-up box transformers (10 / 35 kV), three-chamber box-type substations, 20 ft prefabricated cabin substations, inverter-booster integrated substations, double-split PV transformers, 35 kV and 110 kV main transformers |
| Standards | GB 1094 / IEC 60076; dry-type to GB 1094.11 / IEC 60076-11; energy efficiency to GB 20052-2020 |
| Export markets | Indonesia, Kazakhstan, Vietnam, Russia, the Philippines and others |
| Sales contact | Ivy Xiao · +86 136 8498 9973 · sale@thatransformer.com |
Related article: Solar and BESS Step-Up Transformers: A Specification Checklist · All articles
Jiangsu Tianhua Transformer Co., Ltd. in Xuzhou, Jiangsu, manufactures new-energy step-up box transformers, three-chamber box substations, 20 ft prefabricated cabin substations and inverter-booster integrated substations, assembled and tested in its own factory.
The integrated step-up box puts HV/LV switchgear and the transformer in one oil tank. The cabin substation puts an LV cabinet, transformer, ring main unit and auxiliary power in a 20 ft steel container. It is common for battery storage.
Yes. A double-split dry-type transformer has two low-voltage windings, one for each inverter, stepping up to 10 kV.
Integrated step-up box transformers are built for 10 kV or 35 kV output. At the plant substation we supply 35 kV and 110 kV main transformers.
Yes. Units have pressure and temperature gauges with a communication interface and status contacts for remote monitoring. The cabin substation adds current and voltage detection and remote breaker control.
Send your single-line diagram or equipment list. Our engineers reply with a proposal and price within 24 hours.
Prefer to browse? See all solar, wind & BESS products →