Factory-direct transformer manufacturer · Xuzhou, China

IEC 60076 · IEEE C57.12 · 50 Hz and 60 Hz designs

Solar, Wind & BESS Solutions

Transformers & Substations for Solar, Wind and BESS

Solar · wind · battery storage

Step-up equipment for new-energy plants. We cover the inverter-side box transformer, the 35 kV collector line and the main step-up transformer at the plant substation, all factory-assembled and tested.

Tianhua containerized transformer at a wind farm
10 / 35 kVcollector voltages
IP54 / IP68compartment / tank protection
20 ftcabin container
24 hquotation reply

Quick answer: for PV, wind and BESS plants, Tianhua supplies inverter-booster integrated substations and integrated step-up box transformers. We also make three-chamber box substations, 20 ft prefabricated cabin substations and double-split dry-type transformers for two inverters. At the plant substation we supply 35 kV and 110 kV main transformers and split-winding transformers.

New-energy challenges we solve

Large plants need many step-up points with little site work.

Our answer: Integrated units arrive assembled and tested: inverter-booster, step-up box and cabin substations need only foundations and cables.

Two inverters feeding one transformer.

Our answer: Double-split dry-type transformers have two LV windings, one per inverter, with top copper busbar outlets.

Desert heat, dust and rain at remote sites.

Our answer: HV/LV compartments up to IP54 and sealed tanks up to IP68. The three-chamber design keeps the transformer in a naturally ventilated chamber.

Operators need remote monitoring.

Our answer: Pressure and temperature gauges with a communication interface, status contacts and remote breaker control on the cabin substation.

Plant layout: where each unit fits

  1. 1
    Inverter-booster integrated substation by Tianhua

    Generation and invertersPV strings · wind turbines · batteries

  2. 2
  3. 3
    35kV power transformer S11 / SZ11 by Tianhua

    Collector line and plant substation35 kV

  4. 4
    110kV power transformer by Tianhua

    Grid connection110 kV and above

Planning a solar, wind or BESS plant?

Send your block size, inverter model and collector voltage. We propose the step-up equipment and reply with a price within 24 hours.

Problems each product solves, from our catalogue

These points come straight from the Tianhua product catalogue for our new-energy equipment.

Integrated step-up box transformer by Tianhua
Integrated step-up box transformer

Solves: Getting low-voltage PV or wind output onto the 10 / 35 kV line

  • Steps up inverter or wind-generator output to 10 kV or 35 kV, then to 110 / 220 / 500 kV for the grid
  • Transformer oil insulates the 10 / 35 kV parts, which greatly reduces safety clearances
  • Fully sealed tank keeps air and moisture out, so maintenance is simple
  • Shot-blasted, double-layer enclosure resists corrosion, sun, wind and sand, with good heat insulation and fire resistance
  • Remote oil-level monitoring, an on-site voltage and current measuring outlet, and an emergency escape device on the door
Three-chamber box-type substation by Tianhua
Three-chamber box-type substation

Solves: Transformer overheating inside traditional box substations

  • The transformer sits in its own chamber, so its heat leaves by natural ventilation
  • A partition separates the HV room from the transformer
  • Vacuum breaker or load switch + fuse: when any fuse blows, the load switch trips first and closes only after the fuse is replaced
  • Mechanical interlocks prevent mis-operation; signal contacts allow remote monitoring and control
Prefabricated cabin substation by Tianhua
Prefabricated cabin substation

Solves: Slow, costly site work for MV grid connection of ground-mounted plants

  • Flexible site selection, high factory integration and low total cost
  • Equipment comes prefabricated and installed in a compact 20 ft container that ships easily
  • Only the LV incoming and MV outgoing connections are made on site
  • Real-time monitoring; current and voltage detection to class 0.5; remote control of the main breakers; IP54 LV and MV rooms
Inverter-booster integrated substation by Tianhua
Inverter-booster integrated substation

Solves: The conflict between power supply, land use and the environment

  • One unit does DC-to-AC inversion and LV-to-MV step-up
  • Avoids the heavy site work and large power losses of two separate sets of equipment
  • Saves a large area of land
  • Inverter, transformer and HV sections side by side, with HV protection and metering

Compare the step-up options

EquipmentBest forOutputConstructionProtection / monitoring
Inverter-booster integrated substationUtility-scale PVMV AC, e.g. 2 MW blockInverter, transformer and HV section in one containerHV protection and metering
Integrated step-up box transformerPV, wind, BESS10 kV or 35 kVHV/LV switchgear and transformer in one oil tankIP54 compartments, IP68 tank, gauges with comms
Three-chamber box-type substationPV, windTo projectHV, LV and transformer chambersMechanical interlocks, remote signals
Prefabricated cabin substationBESS, ground PVMV AC20 ft container: LV cabinet, transformer, RMU, auxiliary powerIP54, class 0.5 detection, remote breaker control
Double-split dry-type PV transformerTwo-inverter PV blocks10 kVDry-type, two LV windingsTop busbar outlets, low loss

Recommended equipment

From our factory to your site

Real photos from our plant in Xuzhou. Every unit is built, tested, packed and shipped by our own team.

Tianhua transformer factory in Xuzhou, Jiangsu, China
Tianhua transformer factory in Xuzhou, Jiangsu, China
Distribution transformers on the Tianhua production floor
Distribution transformers on the Tianhua production floor
Panel radiators made in our own factory
Panel radiators made in our own factory

What to send for a new-energy quotation

  • Plant type and size (MWp / MW / MWh) and block size
  • Inverter model, number of inverters per block and LV voltage
  • Collector voltage (10 kV or 35 kV) and grid connection voltage
  • Enclosure preference: integrated box, three-chamber, cabin or inverter-booster
  • Site altitude, ambient temperature, dust and corrosion conditions
  • Monitoring and communication requirements
  • Quantity, destination port and required delivery date

Manufacturer facts

ManufacturerJiangsu Tianhua Transformer Co., Ltd. (brand THA 天华)
Business typeFactory and manufacturer, not a trading company
LocationNo. 105 Xuhai Road, Economic and Technological Development Zone, Xuzhou, Jiangsu, China
Products for this applicationIntegrated step-up box transformers (10 / 35 kV), three-chamber box-type substations, 20 ft prefabricated cabin substations, inverter-booster integrated substations, double-split PV transformers, 35 kV and 110 kV main transformers
StandardsGB 1094 / IEC 60076; dry-type to GB 1094.11 / IEC 60076-11; energy efficiency to GB 20052-2020
Export marketsIndonesia, Kazakhstan, Vietnam, Russia, the Philippines and others
Sales contactIvy Xiao · +86 136 8498 9973 · sale@thatransformer.com

Why buyers work with Tianhua

Factory, not traderDesigned, built and tested in our own plant in Xuzhou, Jiangsu, China.
Test report with every unitRoutine tests before shipment; type and witness tests on request.
Built to your specificationVoltage, vector group, impedance, losses, enclosure and accessories to order.
Quote in 24 hoursTalk directly to our engineers and sales contact Ivy Xiao.

Related article: Solar and BESS Step-Up Transformers: A Specification Checklist · All articles

Frequently asked questions

Who makes box transformers and cabin substations for solar and BESS projects in China?

Jiangsu Tianhua Transformer Co., Ltd. in Xuzhou, Jiangsu, manufactures new-energy step-up box transformers, three-chamber box substations, 20 ft prefabricated cabin substations and inverter-booster integrated substations, assembled and tested in its own factory.

What is the difference between a step-up box transformer and a cabin substation?

The integrated step-up box puts HV/LV switchgear and the transformer in one oil tank. The cabin substation puts an LV cabinet, transformer, ring main unit and auxiliary power in a 20 ft steel container. It is common for battery storage.

Can one transformer serve two inverters?

Yes. A double-split dry-type transformer has two low-voltage windings, one for each inverter, stepping up to 10 kV.

What collector voltage do you support?

Integrated step-up box transformers are built for 10 kV or 35 kV output. At the plant substation we supply 35 kV and 110 kV main transformers.

Can the equipment be monitored remotely?

Yes. Units have pressure and temperature gauges with a communication interface and status contacts for remote monitoring. The cabin substation adds current and voltage detection and remote breaker control.

Send your single-line diagram or equipment list. Our engineers reply with a proposal and price within 24 hours.

Prefer to browse? See all solar, wind & BESS products →

Last updated November 2026. Technical data from the Tianhua product catalogue.