Factory-direct transformer manufacturer · Xuzhou, China

IEC 60076 · IEEE C57.12 · 50 Hz and 60 Hz designs

Prefabricated Cabin Substation for Solar & BESS, 20ft Container

Prefabricated Cabin Substation for Solar & BESS, 20ft Container

Specifications

Quick answer

The prefabricated cabin substation converts the low-voltage AC from new-energy generation into medium-voltage AC and feeds it to the grid. LV cabinets, transformer, ring main unit and auxiliary power are integrated in one 20 ft steel container for ground-mounted PV and storage plants. Made by Jiangsu Tianhua Transformer Co., Ltd. in Xuzhou, China.

TypePrefabricated cabin (container) substation
Enclosure20 ft steel container
EquipmentLV cabinet, transformer, ring main unit, auxiliary power
ProtectionIP54 for LV and MV rooms
MonitoringCurrent and voltage detection to class 0.5; remote breaker control
ManufacturerJiangsu Tianhua Transformer Co., Ltd., Xuzhou, China

Get a quote in 24 hoursEmail our engineers

Key advantages · Applications · Standards and testing · How to order · FAQ

Key advantages

  • Intelligent: real-time status of LV cabinets, transformer and RMU; electrical parameters to class 0.5 accuracy
  • Remote control of main breakers in LV cabinets and RMU, remote status query
  • Simple: internal equipment prefabricated and installed in the factory
  • Compact 20 ft container suits all transport conditions
  • Reliable: robust structure, IP54 LV and MV rooms
  • Quick deployment: only LV incoming and MV outgoing connections on site

Data from the Tianhua product catalogue. Capacity, voltage ratio, vector group, impedance, losses and dimensions can be designed to your specification.

Applications

  • Ground-mounted solar PV plants
  • Battery energy storage (BESS)
  • Wind and hybrid renewable projects

Standards and testing

The transformer is designed and tested to GB 1094 / IEC 60076. The complete substation is assembled, wired and tested in our factory before shipment; applicable substation standards and witness testing are agreed in your quotation.

How to order

Send us

  • rated power and quantity
  • primary and secondary voltage, vector group and tapping range
  • standard (IEC, IEEE / ANSI, GB or your utility specification) and frequency
  • any loss limits or efficiency rule
  • site conditions: altitude, ambient temperature, indoor or outdoor, corrosion
  • destination port and preferred Incoterm

What happens next

  • datasheet and price within 24 hours
  • drawings for your approval
  • production after drawing approval and advance payment, on the date confirmed in the quotation
  • routine tests and test report; witness test on request
  • export packing and shipping

Shipping policy · Terms and conditions

Who makes this substation

Transformer workshop at the Tianhua factory in Xuzhou, China

Jiangsu Tianhua Transformer Co., Ltd. designs, builds and tests this substation in its own 107,000 m² plant in Xuzhou, Jiangsu, China. Founded in 2013, Tianhua is a manufacturer, not a trading company: you deal directly with our engineers, and inspectors are welcome to witness the factory acceptance test.

  • 500+ employees, including 7 senior engineers
  • ISO 9001 quality system; IEC, IEEE / ANSI and GB designs
  • Exported to more than 30 countries and regions

About Tianhua · Factory and testing · Certificates · Projects

Frequently asked questions

What is a prefabricated cabin substation?

A complete MV substation (LV cabinets, transformer, ring main unit and auxiliary power) built and tested inside a steel container in our factory.

What work is needed on site?

Only the low-voltage incoming and medium-voltage outgoing connections. Everything inside is pre-installed.

What protection degree does it have?

IP54 for both the low-voltage and medium-voltage rooms.

How long does the prefabricated cabin substation take to make?

Production starts after drawing approval and advance payment. The delivery date depends on rating and quantity and is confirmed in the quotation.

Can the prefabricated cabin substation be built to my specification?

Yes. Rating, voltage ratio, vector group, impedance, losses, accessories and dimensions can be designed to your specification and standard.

How is the prefabricated cabin substation shipped?

Factory-assembled and tested, on a flat-rack, open-top or break-bulk depending on size. Only the site connections remain.

What warranty does Tianhua give?

The warranty is 1 to 2 years depending on the product and size, confirmed in the quotation and sales contract.

Get a quotation for the prefabricated cabin substation

Send capacity, voltage ratio, standard, quantity and destination. Our engineers reply with a datasheet and price within 24 hours.

Email sale@thatransformer.comWhatsAppCall Ivy Xiao

Data from the Tianhua product catalogue. Written by the Tianhua Transformer engineering team, Xuzhou, China. Last updated November 2026.

Routine test report

Every unit tested before shipment

Factory-direct

Built in our Xuzhou plant

Built to your spec

IEC, IEEE/ANSI or GB

Quote in 24 hours

Datasheet and price from our engineers

More from our factory

Power, distribution, dry-type and substation equipment, all designed, built and tested in our Xuzhou plant.

View all products
Need several units or a full project?

Send your single-line diagram or bill of quantities. Our engineers reply with a datasheet and price within 24 hours.