Factory-direct transformer manufacturer · Xuzhou, China

IEC 60076 · IEEE C57.12 · 50 Hz and 60 Hz designs

Three-Phase Pad-Mounted Transformer, Loop Feed, 45–5,000 kVA
Three-Phase Pad-Mounted Transformer, Loop Feed, 45–5,000 kVA
Three-Phase Pad-Mounted Transformer, Loop Feed, 45–5,000 kVA
Three-Phase Pad-Mounted Transformer, Loop Feed, 45–5,000 kVA
1 / 4

Three-Phase Pad-Mounted Transformer, Loop Feed, 45–5,000 kVA

Specifications

Quick answer

Our three-phase loop-feed pad-mounted transformer is a tamper-resistant, ground-mounted unit for looped underground networks. Ratings 45–5,000 kVA, primary 2.4–34.5kV, secondary 208Y/120V to 600V, mineral oil or FR3. Made by Jiangsu Tianhua Transformer Co., Ltd. in Xuzhou, China.

Rated power45, 75, 112.5, 150, 225, 300, 500, 750, 1000, 1500, 2000, 2500, 3000, 3750, 5000 kVA
Primary2400/4160/4800V; 12000/12470/13200/13800/14400V; 20780/21600/22900/24940/26400V; 33000/34500V
Secondary208Y/120, 240, 416, 480Y/277, 600V
Frequency60Hz or 50Hz
Temperature rise55°C, 65°C or 55/65°C
CoolingONAN or KNAN
CoreBurr-free grain-oriented silicon steel, five-limb
WindingsCopper or aluminium
Example configS13-M-630kVA 10.5±2×2.5%/0.4kV, Dyn11, Uk 4%
ManufacturerJiangsu Tianhua Transformer Co., Ltd., Xuzhou, China

Get a quote in 24 hoursEmail our engineers

Key advantages · Standard and custom designs · Applications · How to order · FAQ

Key advantages

  • Loop feed with 4-position load-break switch
  • Dead-front or live-front HV bushings
  • Bay-o-net fusing with backup current-limiting fuse
  • Five-position tap changer
  • Mineral oil (ONAN) or Envirotemp FR3 (KNAN)
  • Options: K4/K13/K20, electrostatic shield, stainless tank, step-up design

Standard and custom designs

Standard design data. Capacity, voltage ratio, vector group, impedance, losses, cooling and dimensions can be designed to your specification.

Applications

  • Residential subdivisions and housing estates
  • Commercial centres, hospitals, campuses
  • Data centers and EV charging hubs
  • Solar and storage sites (step-up)

Standards and testing

IEEE/ANSI C57.12, IEC 60076. Routine tests are performed on every unit before shipment and the test report is supplied; type tests and witness testing are available on request.

How to order

Send us

  • rated power and quantity
  • primary and secondary voltage, vector group and tapping range
  • standard (IEC, IEEE / ANSI, GB or your utility specification) and frequency
  • any loss limits or efficiency rule
  • site conditions: altitude, ambient temperature, indoor or outdoor, corrosion
  • destination port and preferred Incoterm

What happens next

  • datasheet and price within 24 hours
  • drawings for your approval
  • production after drawing approval and advance payment, on the date confirmed in the quotation
  • routine tests and test report; witness test on request
  • export packing and shipping

Shipping policy · Terms and conditions

Who makes this transformer

Transformer workshop at the Tianhua factory in Xuzhou, China

Jiangsu Tianhua Transformer Co., Ltd. designs, builds and tests this transformer in its own 107,000 m² plant in Xuzhou, Jiangsu, China. Founded in 2013, Tianhua is a manufacturer, not a trading company: you deal directly with our engineers, and inspectors are welcome to witness the factory acceptance test.

  • 500+ employees, including 7 senior engineers
  • ISO 9001 quality system; IEC, IEEE / ANSI and GB designs
  • Exported to more than 30 countries and regions

About Tianhua · Factory and testing · Certificates · Projects

Frequently asked questions

What is included in the HV compartment?

Load-break switch, bay-o-net fuses, current-limiting fuses, elbow-ready bushings, arresters and fault indicators as specified.

Is DOE 2016 efficiency available?

Tell us the efficiency rule for your market and we design losses to meet it.

How long does the three-phase pad-mounted transformer take to make?

Production starts after drawing approval and advance payment. The delivery date depends on rating and quantity and is confirmed in the quotation.

Can the three-phase pad-mounted transformer be built to my specification?

Yes. Rating, voltage ratio, vector group, impedance, losses, accessories and dimensions can be designed to your specification and standard.

How is the three-phase pad-mounted transformer shipped?

In a 20 ft or 40 ft container, filled with oil and ready to install.

What warranty does Tianhua give?

The warranty is 1 to 2 years depending on the product and size, confirmed in the quotation and sales contract.

Get a quotation for the three-phase pad-mounted transformer

Send capacity, voltage ratio, standard, quantity and destination. Our engineers reply with a datasheet and price within 24 hours.

Email sale@thatransformer.comWhatsAppCall Ivy Xiao

Data from the Tianhua product catalogue. Written by the Tianhua Transformer engineering team, Xuzhou, China. Last updated November 2026.

Routine test report

Every unit tested before shipment

Factory-direct

Built in our Xuzhou plant

Built to your spec

IEC, IEEE/ANSI or GB

Quote in 24 hours

Datasheet and price from our engineers

More from our factory

Power, distribution, dry-type and substation equipment, all designed, built and tested in our Xuzhou plant.

View all products
Need several units or a full project?

Send your single-line diagram or bill of quantities. Our engineers reply with a datasheet and price within 24 hours.